Box Hill Central Railway Station - Project No: 82425
Box Hill Central railway station clearance demo of shops and building, and excavation in stages to lower railway lines (while maintaining rail services). Building railway platforms at underground level.
| The first stage of the excavation works that lower the rail lines to run under station street. This work was performed whilst maintaining the existing rail service operating above. |
|
 |
| The bulk excavation works of stage two are near completion in preparation for platform building. The excavated material was used to build roads. |
|
 |
| Excavation continues to lower levels under station street bridge. |
|
 |
| The trains are now operating in the first stage of the project. |
|
 |
| Stage three civil works are continuing with platform construction, drainage and detailed excavation in preparation for railway ballast. |
|
 |
| Stage four is about to begin. This is the second half of the project which included platform building, drainage and detailed excavation. |
|
 |